Water & Effluent Systems
Source, storage, treatment and discharge sized for peak shift demand, with ETP, STP and WTP trains engineered to the effluent load.
Compliance in, violations out — EIA, EMP, ESIA and DoE clearance through to ETP/STP/WTP design and installation, Higg FEM & FSLM audits, and the stack, air, noise and illumination testing that proves it.
WTP, sump & pump room
Effluent train & stack
Assessment, clearance, treatment plant and monitoring under one roof — from the EIA and management plan the authorities read, to the ETP/STP/WTP the site runs on, and the stack, air, noise and illumination tests that keep the consent alive.
Clear deliverables, fixed scope, milestone billing.
Source, storage, treatment and discharge sized for peak shift demand, with ETP, STP and WTP trains engineered to the effluent load.
EIA, EMP, ESIA and IEE to DoE guidelines, with the ECC and consent package prepared and followed to issue.
Stack emission, indoor and ambient air, noise, illumination and thermal testing, GHG and ODS inventories, Higg FEM and FSLM audits.
From the baseline survey to the monitoring schedule that keeps the clearance alive — the same five-step rhythm on every engagement, so you always know what happens next.
We walk the site with you: process, discharge route, stacks and utilities, and the compliance clock the project is working against.
Stack emission, ambient and indoor air, noise, illumination and effluent sampled on site, with the laboratory programme that closes every parameter.
The EIA, EMP, ESIA or IEE written against the DoE format, alongside the ETP, STP or WTP process design that answers it.
ECC, DoE consent, BLA, RAJUK, RSC and BEPZA packages prepared, submitted and followed through to a decision.
A recurring sampling schedule, O&M manuals and re-test support that hold the clearance and the Higg score together.
Every flow, load and discharge limit traces back to a clause you can cite in front of the authority.

Tell us the site, the industry and the deadline. We will come back with a scoped proposal — typically within two working days.